Sinking power plant foundation machined to 0.1 mm flatness in three days

At a 10 MW power plant in Slagelse, Denmark, a settling foundation had put the gearbox 7 mm out of line with a newly installed generator. CNC Onsite scanned the foundation, milled four areas on site and had the drivetrain realigned in three days.

Gantry milling machine lifted by crane into the power plant
Measured result

Four foundation areas milled to 0.1 mm flatness

The gearbox sat about 7 mm lower than the new generator. After a 3D laser scan, four areas of the foundation were milled on site to 0.1 mm flatness and the drivetrain realigned. Three days in all.

  • 7 mm Gearbox offset from the sunk foundation
  • 0.1 mm Flatness on the milled areas
  • 3 days Project duration on site
  • 10 MW Power plant

All figures are from the published case and Metal-Supply, February 2025. They describe this one job at one plant. 'Months of downtime' is an estimate and stays 'potentially'.


The situation

A 10 MW power plant in Denmark was replacing its generator. During installation of the new unit, Siemens Energy's technicians found that the gearbox and generator would not align. The cause was a foundation that had been sinking gradually, leaving the gearbox roughly 7 mm lower than the generator.

Alignment between gearbox and generator has to be exact. Even small deviations cause vibration, wear components faster, cut efficiency and can end in costly downtime. And the offset could not be seen, so it took precise measurement to find and fix.


What we did

CNC Onsite was called in as an urgent job in January 2025. The first step was a complete 3D laser scan of the foundation. The measurements confirmed the misalignment and showed which areas of the foundation needed correcting; Siemens Energy's specialists in Germany then selected the areas to mill.

The machining was done with CNC Onsite's newly developed gantry milling machine, brought into the plant and set up over the foundation. Technicians milled four selected areas directly on site to a flatness of 0.1 mm, restoring the correct position of gearbox and generator without rebuilding the foundation.

Gantry milling machine suspended in slings over the foundation next to the new generator
Fig. 01The gantry milling machine set up over the foundation, next to the new generator.

The result

After machining, the connecting flanges between gearbox and generator were restored and realigned, and the plant could resume operation. The whole job took three days.

  • Gearbox and generator alignment fully restored
  • Foundation machined to 0.1 mm flatness
  • Misalignment of about 7 mm corrected
  • Completed in three days, potentially saving months of downtime
  • Power generation back on the grid
Gantry milling machine over a machined area of the foundation
Fig. 02One of the areas selected from the laser scan, after milling.

What it means for ageing plants

As power plants and industrial drivetrains age, foundation settlement can create alignment problems that threaten reliability and push up maintenance costs. Precise measurement combined with on-site machining can restore alignment without major civil works: less downtime, avoiding costly component replacements, and a longer service life for existing assets.

Customer quote

“The tolerance is lower than it was when we first installed the power plant 30 years ago. The technicians used their technical skills to hit the nail on the head. No two foundations are the same and you need teamwork for this job. My colleagues in Germany who selected the areas to mill were equally impressed.”

Peter Bang, Service Manager, Siemens Energy
Talk to us

Facing a similar challenge?

Describe the component, the tolerance you need and where it sits. We come back within one working day with an assessment of what is possible on site.

Ole Andersen
Your direct contact Ole Andersen Technical Sales – Ad Hoc oan@cnconsite.dk +45 31 51 11 48